Technical Sales: sales@tsgfurnace.in
ISO 14001 Certified
Request Technical Consultation

Continuous Vacuum Carburizing System

Model Code: TVCC • Processing Method

ISO 9001:2015 Quality Verified
TVCC

Continuous Vacuum Carburizing System

High quality achieved through Hi-Pascal technology (patent pending). The excellent cooling performance of the TVC series achieves high hardness and low distortion.

Continuous system eliminates transfer losses, resulting in energy-efficient operation.

Maintenance access from both sides effectively utilizes space while significantly reducing maintenance costs.

Remote monitoring enables visualization of maintenance management, operation status, and inspection information.

No need to move large equipment, reducing equipment downtime risk and lowering running costs during operation.

Main Workpieces
  • Gears
  • Shafts
  • Machine Parts
  • Bearings
Contact Sales

Specifications

Specification TVCC (1) TVCC (2) TVCC (3) TVCC (4)
Configuration 1 Heating Chamber + Quenching Chamber (8.15m) 2 Heating Chambers + Quenching Chamber (13.15m) 3 Heating Chambers + Quenching Chamber (16.15m) 4 Heating Chambers + Quenching Chamber (19.15m)
Cycle Time 300 min (5h) 135 min (2.25h) 90 min (1.5h) 70 min (1.17h)
Production Capacity 80kg/h 177kg/h 266kg/h 342kg/h
Processing Cost 17.7 JPY/kg 14.6 JPY/kg 12.4 JPY/kg 11.5 JPY/kg

Related Industrial Thermal Systems

TVC Vacuum Carburizing System
Vacuum Furnace

Vacuum Carburizing System

Vacuum Carburizing, Vacuum Carbonitriding, Vacuum Oil Quenching, Vacuum Tempering
View Details
TVCC-G Continuous Vacuum Magnetic Annealing System
Vacuum Furnace

Continuous Vacuum Magnetic Annealing System

Vacuum Magnetic Annealing, Vacuum Stress Relief Annealing, Vacuum Gas Cooling
View Details
TVO Vacuum Oil Quenching System
Vacuum Furnace

Vacuum Oil Quenching System

Vacuum Hardening System, Vacuum Oil Quenching, Vacuum Gas Cooling
View Details

Require Sizing, Custom Refractory, or Atmosphere Configuration?

Submit your material process specs and receive a detailed engineering recommendation within 24 hours.